Ahmed Karim
ACP · Consultant PM
AK
AR
Non-Conformance Reports
Root cause analysis, corrective actions and verification closeout
New NCR
Open NCRs
2
Awaiting assignment
In Review
1
Under investigation
Corrective Action
2
Remedial works in progress
Closed
1
Resolved & verified
All categories
Quality
Safety
Environmental
Workmanship
Material
Design
All
7
Open
2
Under Review
1
Corrective Action
2
Verification
1
Closed
1
Number
Title
Category
Severity
Due
Status
NCR-0042
Rebar spacing non-conformance - Grid A3
Quality
Major
06-05
Corrective Action
NCR-0043
Missing edge protection - Level 12 slab edge
Safety
Critical
06-02
Open
NCR-0044
Concrete surface voids - Column C-15
Workmanship
Minor
06-10
Under Review
NCR-0045
Welding defect - Beam connection Grid F-G
Quality
Major
06-08
Verification
NCR-0046
Dust control inadequate - Demolition area
Environmental
Major
06-06
Corrective Action
NCR-0047
Wrong tile specification installed - Level 2 lobby
Material
Minor
05-25
Closed
NCR-0048
Design deviation - MEP shaft opening size
Design
Critical
06-09
Open